DEC-CTL-001B
CTL Helper Procedure | ||||||||||||
1. Compare coil number, from tag, to tag on work order. | ||||||||||||
2. Load and center coil. Input coil diameter on tension setting. | ||||||||||||
3. Close leveler. Turn on autotension. | ||||||||||||
4. Adjust leveler settings for bow (back in and out of leveler). | ||||||||||||
5. Crop head of coil at entry crop shear (as needed) | ||||||||||||
6. Run halfway down table, begin adjusting for shape (as needed). Continue feeding into fixed stretch head. | ||||||||||||
7. Set steering feed roll laser. | ||||||||||||
8. Inspect/change gripper cardboard. | ||||||||||||
9. Lower steering roll. Lower tables if looping coil. | ||||||||||||
10. Run coil to moveable stretch head. Set centering guides. | ||||||||||||
11. Move dunnage for next job to stacker. | ||||||||||||
12. Run 1-3 sheets then check specs as compared to work order requirements.
Length must be written down and intialed, by someone other than the operator, on the work order. |
||||||||||||
13. Place appropriate dunnage between bundles. | ||||||||||||
14. Communicate measurements, to the operator at required frequency, for recording onto production report.
|
||||||||||||
|
||||||||||||