LYN-SHP-001 | Shipping Procedure |
Shipping Procedure
1. Sales enters an order, a work order prints and a shipping order prints.
2. Shipping personnel takes the work order and pulls the corresponding tags from stock on the floor.
3. Completed work orders are all given to the Logistics Planner.
4. Logistics Planner matches the completed work order(s) to the shipping order(s) and creates the loading order.
5. Logistics planner builds the loads using the loading orders.
6. Trucks are assigned loads and loads are given to shipping personnel.
7. Trucks are loaded matching the tags given on the load paperwork and tag stubs are removed AFTER the material is put on the truck.
8. Stubs are matched in Stelplan prior to shipping.
9. BOL is printed by shipping personnel and tags are shipped in Stelplan.
10. Parts are ready to ship.
Revision Date | Revision Level | Changes Made |
01/02/19 | 0 | Original Version |